Head of Hamedan Regional Water Company:

The basic solution for drinking water supply in Hamedan is to transfer water from Talvar Dam

The head of Hamedan Regional Water Company, stating that it has been done with coordination and planning and interaction with the operators, tries to supply part of the drinking water from other water sources such as Abbas Abad. Talwar Dam stated.

  2022-02-27
Deputy of protection and utilization of water resources of Hamedan Regional Water Company:

43% of the dam reservoirs in the province are full

The Deputy Minister of Water Resources Protection and Utilization of Hamadan Regional Water Company announced a 22% decrease in rainfall in Hamadan province compared to last year and said: "Currently, 43% of the reservoirs of dams in the province are full."

  2022-02-19
Head of Hamedan Regional Water Company:

60% of the water required by the city of Hamedan will be provided by the water supply project

The head of the Hamedan Regional Water Company said: about 60% of the water required by the city of Hamedan from the water supply project to Hamedan will be supplied from Talvar Dam.

  2022-02-19
Head of Hamedan Regional Water Company:

The volume of Ekbatan and Abshineh dams reached 6% / The need to manage consumption and improve the cultivation pattern in Hamedan

The head of the Hamedan Regional Water Company, noting that the volume of Ekbatan and Abshineh dams has reached 6%, called for consumption management and improvement of the cultivation pattern in Hamedan and planning in this area.

  2022-02-14
The head of the regional water company informed:

Only 7% of Ekbatan Dam is full

The head of the Hamedan Regional Water Company said: The current volume of Ekbatan Dam is 2 million and 240 thousand cubic meters, with this volume only seven percent of the volume of this dam is full.

  2022-02-01
Head of Hamedan Regional Water Company:

400 billion tomans will be injected into the water transfer project to the city of Hamedan

The head of the Hamedan Regional Water Company said: The Minister of Energy promised that 400 billion Tomans would be given to the project.

  2022-01-25
Extension of the ban on the development of exploitation of

groundwater resources in the Komijan study area located in the central and Hamedan provinces

The ban on the development of exploitation of groundwater resources in the Komijan study area located in the central provinces and Hamedan was extended.

  2022-01-24
Simultaneously with the birth of Hazrat Fatemeh Zahra (PBUH)

A ceremony honoring the women of the Hamedan Regional Water Company was held

On the occasion of Women's Day and the high position of mother, a festive ceremony was held on this occasion in Hamedan Regional Water Company.

  2022-01-24

Meeting of the head of Hamedan Regional Water Company with the CEO of ABFA Hamedan

The head of Hamedan Regional Water Company met with the CEO of ABFA Hamedan

  2022-01-24

Meeting of the head of Hamedan Regional Water Company with the Minister of Energy

Follow up on the issue of sustainable supply of drinking water in Hamedan in a meeting with the Minister of Energy

  2022-01-20
Managing Director of Hamedan Regional Water Company:

Continuous review of water supply project to Hamedan / first phase requires 700 billion tomans

The CEO of Hamedan Regional Water Company informed about the continuous review of the water supply project to Hamedan and said: in order to review this project, the workshop and the mentioned project are visited every 10 days.

  2022-01-09
The head of water resources management of Razan city announced;

Blocking 808 illegal wells in Razan city

The head of water resources management of Razan city said: since the beginning of the plan to rehabilitate and balance groundwater resources, 808 wells have been blocked in Razan city and more than 134 million cubic meters have been prevented from illegal withdrawals.

  2022-01-05
The CEO of Hamedan Regional Water Company announced;

Forecast of 13 billion tomans for water supply to Malayer in the 1401 budget

The CEO of Hamedan Regional Water Company said: in order to complete and complete the remaining works of the water supply project to Malayer, in the budget bill of 1401, about 13 billion Tomans of credit has been foreseen.

  2022-01-05
The governor of Hamedan in the meeting of the council of protection :

of water resources of the province raised

We try not to have a problem with drinking water supply The governor of Hamedan said: "Despite the 41% decrease in rainfall and the risk of water shortage, we try not to have water supply problems, but the people should cooperate."

  2021-06-08
Hamedan Regional Water Director in the meeting of the Provincial

Water Resources Protection Council raised: The water storage volume of Ekbatan Dam in Hamedan has reached 62%

The CEO of Hamedan Regional Water Company said that after about 9 months of the current water year, the volume of water storage behind Ekbatan Dam has reached 62%.

  2021-06-08

Appreciation of the governor from the CEO of Hamedan Regional

Water Company The CEO of Hamedan Regional Water Company was honored

  2021-04-07

The call of water well drilling supervisors (private sector) was extended until the end of April.

The deadline for calling water well supervisors (private sector) in Hamedan Regional Water Company was extended until the end of April.

  2021-04-07

Appreciation of the representative of the Islamic Consultative

Assembly from the CEO of Hamedan Regional Water Company The people's representative of Razan city in the Islamic Consultative Assembly praised the CEO of Hamedan Regional Water Company.

  2021-04-07

Save more than 6 million cubic meters of groundwater resources in Hamadan province

The Managing Director of Hamadan Regional Water Company stated: Since the beginning of this year, 212 illegal wells have been blocked, it is expected to reach 600 wells by the end of this year.

  2019-08-17

Construction of new dams has been planned in Hamedan province

Managing director of Hamedan Regional Water Company, referring to the role of dams in controlling the flood caused by rain, said the construction of new dams in Hamedan province has been planned.

  2019-05-15

Saving 257 million cubic meters of water consumption in Hamedan province

Managing director of Hamedan Regional Water Company announced the blockade of 3,524 unauthorized wells in Hamedan and said:The blockage of this number of unauthorized wells saved more than 257 million cubic meters of water consumption in the province.

  2019-05-15
 
 
 
 
 
 
 
Links

Links

Statistics

  • Online Users : 67
  • Max Visit : 507
  • Today : 8,463
  • Yesterday :
  • Total : 5,476,167
  • last update : 2024-05-02 08:28:43
  • Your IP Address : 3.144.97.189

Contact Us

  • Address :
  • P.O Box : +98-7916795639
  • Tel : +98-7633335411-15, +98-7633932145
  • Fax : +98-7633351371
  • Email : info[at]hrrw.ir
  • SMS :
  • : 1811